Project Timeline

Project phases and HSE activities throughout the lifecycle

Design Phase

Completed

HSE considerations in design phase, design review phase, material selection, and design specifications

Key Activities:

  • Hazard identification in design
  • Design review for HSE compliance
  • Material selection for safety
  • Design specifications review

Procurement Phase

Completed

Supplier selection, material quality control, and subcontractor management

Key Activities:

  • Supplier HSE qualification
  • Material quality control
  • Safety data sheets review
  • Subcontractor HSE assessment

Construction Phase

In Progress

Site setup, excavation, pipeline installation, reservoir construction, and related activities

Key Activities:

  • Site establishment and safety setup
  • Excavation and trenching
  • Pipeline installation
  • Reservoir construction
  • Trench safety management
  • Working at heights
  • Heavy machinery operation

Testing and Commissioning

Pending

Procedures for testing and commissioning phase with quality and safety standards

Key Activities:

  • Pressure testing
  • Hydro testing
  • System commissioning
  • Quality verification

Handover Phase

Pending

Formal transfer of responsibility for the project to the client (NWS Company)

Key Activities:

  • Documentation preparation
  • Training for client personnel
  • System handover
  • Final HSE inspection

Decommissioning Phase

Pending

Addressing all HSE aspects during the project closure and site clearances

Key Activities:

  • Site cleanup
  • Waste disposal
  • Equipment removal
  • Environmental restoration

Project Duration

Total project duration is 36 months including the mobilization phase, from design and procurement through construction, testing, commissioning, and handover.